Singapore ERSS design, QP submission and BCA NOA support
+65 9800 4385 · pe@qp.sg
Earth Retaining & Stabilising Structures

ERSS design, QP submission and BCA NOA support in Singapore.

ERSS.sg helps developers, contractors, architects, QPs and owners prepare authority-ready ERSS design documentation, coordinate Qualified Person review and support submission workflows towards BCA plan approval / NOA.

View Submission Triggers
QP(ST) coordinationAC / AC(Geo) interfaceCORENET documentationSite implementation support
Typical ERSS ScopeExcavation depth, adjacent structures, groundwater, utilities, temporary works and monitoring limits.
Excavation H
What we do

Authority-facing ERSS support from early feasibility to close-out.

Excavation works can trigger formal ERSS plan approval, QP appointment, Accredited Checker review, geotechnical review, site implementation records and monthly submission obligations. We structure the engineering workflow so clients understand what is needed before work starts.

01

ERSS design review

Support for retaining system selection, excavation staging, temporary works assumptions, design basis and engineering coordination.

02

BCA submission / NOA

Preparation and coordination of ERSS submission materials, supporting reports, forms and authority-facing clarifications.

03

Construction stage support

Assistance with site implementation records, instrumentation / monitoring coordination, Annex C and monthly Annex E workflow.

BCA-oriented threshold guide

When ERSS submission may be required.

A quick client guide based on BCA's ERSS submission requirements. Final requirements depend on actual site condition, excavation type, dimensions, surrounding risks and applicable regulations.

Excavation / ERSS conditionTypical requirementAppointment considerations
Excavation / ERSS not deeper than 1.5 mPlan approval may not be required, subject to exemptions and site context.Confirm whether it forms part of building works or other authority-triggering scope.
More than 1.5 m and up to 4 mERSS plan submission by QP(ST).AC generally not required under the BCA threshold table.
More than 4 m and up to 6 mERSS plan submission and checking.QP(ST) and AC involvement typically expected.
More than 6 m, GBW / basement excavationHigher-risk ERSS / geotechnical building works route.QP(ST), QP(Geo), AC and AC(Geo) may be required.

Note: where the earth retaining structure is not constructed of reinforced concrete or steel, BCA indicates that the applicable depth can be 1 m instead of 1.5 m.

Our workflow

Designed for contractors and consultants who need clear submission readiness.

Scope and document intake

Collect site plan, proposed excavation levels, adjacent structures, utilities information, SI report, method statement and programme.

Engineering assessment

Review ERSS concept, design assumptions, stage sequence, temporary works interface, monitoring trigger values and risk controls.

Submission package

Coordinate drawings, calculations, ERSS Annex A, SI certification requirements and authority clarifications for BCA-facing submission.

NOA and commencement support

Support the project team through BCA comments, plan approval / NOA workflow, permit and commencement notification steps.

Guides for project teams

Useful pages before you start excavation or ERSS submission.

Step-by-step ERSS guide

Understand the sequence from excavation screening, QP / AC appointment, SI report, ERSS design, BCA submission, permit, Annex C, Annex E and record plan close-out.

Read Step Guide

Cost-saving tips

Learn practical ways to avoid redesign, unnecessary delay, duplicated submission effort and poor temporary works planning without compromising safety or compliance.

View Cost Tips

Have an excavation, basement, trench, pile cap or temporary ERSS scope?

Send us your drawings, excavation depth, site photos, SI report if available, and intended start date. We will review the likely ERSS submission pathway.